New construction of a 2 or 3 bedroom home (determined once family is selected which is expected by April 2025). This build replaces a home that had been destroyed by fire and left as a shell for an extended time. The home has been removed and is ready for building in mid-summer. Photo attached is same design of a previously built home by LAHFH